205 EAST 42 STREET, 16, Midtown East, Manhattan (BBL 1013161024) has no recorded arm's-length sale. Source: NYC Department of Finance recorded deed sales; not an appraisal.
Last market sale
n/a (no market sale)
last deed $15,000,000, Nov 10, 2025: a building sale of 11 lots
Price / ft²
n/a (no market sale)
Market sales
1
arm's-length
Assessed value FY2027
$4,737,947
DOF market value
Recorded sale history
Every deed transfer on record for this lot since 2003, including non-market transfers (marked). Only arm’s-length sales feed our price metrics.
| Recorded | Class | $/ft² | Price | Status |
|---|---|---|---|---|
| Nov 10, 2025 | RB | — | $15,000,000whole-building total | Building sale · 11 lots |
Source: NYC Dept. of Finance recorded sales (ACRIS/DOF) · all recorded transfers; market flag per methodology · data through · methodology
Other units in this building
Building permits
252 permits issued for this building (the whole condominium) since 2003: alteration 94, structural and foundation 3, plumbing 44, mechanical and boiler 55, fire protection 55, sign 1. The 10 newest:
| Issued | Work | Est. cost | Status |
|---|---|---|---|
| Jun 12, 2026 | Mechanical Systems · Mechanical and boilerInstallation of (1) 10 ton package water cooled unit replacement on the exact same location at the 12th floor.Job M01237121-I1 | $20,000 | Signed-off |
| Jun 9, 2026 | General Construction · AlterationMPP Project-000000603. Filing for the conversion of the 15th floor from commercial to residential use as shown. All other floors are existing to remain as commercial and have no changes.Job M01385373-I1 | $2,500,000 | Permit Issued |
| Jun 4, 2024 | Sprinklers · Fire protectionSprinkler work during interior demolition on 14th floor.Job M01041265-I1 | — | Signed-off |
| May 20, 2024 | General Construction · AlterationInterior demolition to include removal of partitions and patching existing wall and floor finishesJob M01041242-I1 | — | Signed-off |
| May 20, 2024 | Mechanical Systems · Mechanical and boilerMechanical work during interior demolition on 14th floor.Job M01041255-I1 | — | Signed-off |
| Nov 29, 2023 | Sprinklers · Fire protectionSprinkler work for CUNY on floors 10 & 11.Job M00943874-I1 | $12,996 | Signed-off |
| Nov 28, 2023 | General Construction · Alterationgeneral construction for CUNY space on floors 10 & 11.Job M00943857-I1 | $248,292 | Signed-off |
| Nov 28, 2023 | Mechanical Systems · Mechanical and boilerMechanical work for demolition, relocation, and addition of ductwork and diffusers downstream of VAV for CUNY on floors 10 & 11Job M00943868-I1 | $33,984 | Signed-off |
| Nov 22, 2023 | Mechanical Systems · Mechanical and boilermechanical work for URI space on 13th floorJob M00949672-I1 | — | Signed-off |
| Nov 16, 2023 | Standpipe · Fire protectionSprinkler/standpipe work for URI space on 13th floorJob M00951139-I1 | — | Signed-off |
Source: NYC Dept. of Buildings permits (DOB NOW and BIS) · initial permits issued since 2003; sidewalk sheds, fences, scaffolds and renewals left out · data through · methodology
Not affiliated with the City of New York. Compiled from official NYC Open Data (Department of Finance sales & assessment, City Planning PLUTO & Property Address Directory, Department of Buildings permits), provided as-is without warranty. This is a record of transactions, not an appraisal or an estimate of current value. Non-arm’s-length transfers (family, $0 deed corrections, partial interests) are shown for completeness and excluded from price metrics. See our methodology.